How change lands

Change dips before it sticks

Most change plans are built around launch day. The harder part comes after it, when people have to work differently on an ordinary Tuesday. Two well-known models explain what happens next, and what to do about it.

01 · The change curve

Every change dips before it climbs

When something changes at work, confidence usually falls before it rises. People move from shock and denial, through frustration, to a low point, and then start to try the new way. The dip is normal. It is not a sign the change is failing.

A ribbon that rises a little, falls to a low point, then climbs higher than where it began.
  1. Shock “Wait, when was this decided?”
  2. Denial “It will blow over. These things always do.”
  3. Anger and blame “Nobody asked us.”
  4. Fear and bargaining “Can I keep doing it the old way?”
  5. Low point “I was good at my job last week.”
  6. Exploration “Show me that bit again.”
  7. Decision “Fine. This part is quicker.”
  8. Integration “This is just how we work now.”
8 seconds, no sound. The stages appear in order.

After Elisabeth Kübler-Ross, 1969. The model began as a description of grief and was later adapted for change at work.

02 · The adoption curve

People take up change at different speeds

Not everyone moves at once. A small group tries a new tool first. Most people wait for proof that it works, and some wait until it is simply how things are done.

A bell curve cut into five blocks, small at each end and tallest in the middle.
  • Innovators 2.5% Try it first
  • Early adopters 13.5% See the point early
  • Early majority 34% Want proof it works
  • Late majority 34% Wait until it is normal
  • Laggards 16% Change last, if at all

Everett Rogers, Diffusion of innovations, 1962.

03 · The two together

Same change, five different journeys

Put the two together and one rollout looks like five. Early groups dip briefly and recover fast. Later groups dip further and take longer to climb, which is where support is needed most and usually arrives least.

This picture is tuesday’s reading. It is not a published model.

Five ribbons that start together. Each dips further and climbs later than the one before.
  • Innovators Barely dip
  • Early adopters Dip briefly
  • Early majority Follow the proof
  • Late majority Climb slowly
  • Laggards Climb last

Groups: Rogers, 1962. Curve: after Kübler-Ross, 1969.

04 · What to do with this

Three things to plan for

Plan for the dip

Expect confidence to fall in the first weeks, and say so in advance. A dip people were told about is far easier to live through than one that comes as a surprise.

Start with the early groups

Their results are the proof the majority is waiting for. Help them get there quickly, then show everyone else what they did.

Stay for the late ones

Keep support running after launch. The last groups reach their low point long after the project team has moved on.

Planning a change and want it to stick?